New water connections: how to apply

Please use the step-by-step guide below to assist you in applying for a new water connection.

Step 1 - Select the appropriate application form:

Please use the table below to determine which application form you require:

Site Details Application form required

New Single Connection /
Maximum of 5 new connections /
Replacement connection /
Temporary building supply
(including Temporary Building Supplies that will be made permanant connections, as well as those that will be disconnected)

Application for a new or replacement water connection
   (Domestic/non-domestic)

What you'll need to complete this application


>5 New Connections 
(New Company Main and Services)*

Budget only

Application for proposed development (Budget enquiry)

What you'll need to complete this application

>5 New connections
(New Company Main and Services)

Application for proposed development mains and service connections.

What you'll need to complete this application

Fire Sprinkler System

Application for proposed development mains and service connections.
    (Can be included on New Service
    applications.)

Policy on domestic sprinklers

What you'll need to complete this application

Fire Main

Application for proposed development mains and service connections.
    (Can be included on Mains/Services
    applications.)

What you'll need to complete this application

Diversion of existing Main

Application for Main Diversion

What you'll need to complete this application

Self-lay

Our application process is as set out in the WRc self-lay Code of Practise. Further information is provided in our self-lay addendum below.

WRc self-lay Code of Practice *

Application form

Self-lay agreement

You can find additional information on self-lay charges and the calculation of the asset payment in the guidance below.

Guidance on allocation and calculation of costs for self-lay water mains

* Please note South East Water will provide guidance, if necessary, on whether to install a company main. Where relevant we will offer the options of both connections from an existing company main, as well as the installation of a new company main.

Step 2 - Complete the application form:

Please fill out the relevant application form completely and return to us, attaching all documentation requested on the application form. Failure to enclose the correct documentation will result in a delay to your application.

Step 3 - Estimate of costs:

Estimate prepared – including confirmation of costs (service pipe connection cost, requisition charge or self-lay charges) and asset payment.

A draft section 42 undertaking or self-lay agreement will be sent with the estimate.

Step 4 - Inspection (services only):

Request Inspection, Trench and Private supply pipe 

There is a minimum and maximum depth at which service pipes should be laid:

  • Minimum depth is 750 mm
  • Maximum depth is 1350 mm 

If an installer wishes to install a service pipe either deeper or shallower than these depths they must notify South East Water for permission.

Important note: The water service pipe must be a minimum of 350 mm away from any gas supply.

Step 5 - Meter Installation and account set-up

The final stage is the installation of your water meter and completion of the set-up of the account.

Please note – if South East Water has not received your plot to postal information prior to connection being made then the account(s) will be set up under the name of the developer who will be liable for all charges relating to the account(s).

side image

Checklist: what do I need to complete my application?

Find out more